If we do use a different notation (perhaps t vs T) for absolute time-offset versus time-offset from the most recent tick of the grid-level above, then note that, in the above, the measure-level would be notated differently to the lower-levels.
If we introduced grid-levels above the measure (phrase, theme, theme group, section, movement, etc) then the measure-level would become relative.